Accueil Siemens receives order from transpower to connect offshore wind Siemens receives order from transpower to connect offshore wind

Siemens receives order from transpower to connect offshore wind

Print Friendly, PDF & Email

A consortium of Siemens Energy and Prysmian Powerlink will connect two North Sea offshore wind farms to the grid. The Veja Mate and Global Tech 1 offshore wind farms, which will have a combined power generating capacity of as much as 800 megawatts (MW), will be connected to the grid via a submarine cable link carrying high-voltage direct current (HVDC). BorWin 2 will be the first offshore wind farm connection ever realized applying VSC multilevel technology with a rating of 800 MW.